Skip to content
VVineyard History

Era VIII · 2013 to today

A City on the Lake

From grapevines to steel to a city on the lake.

In a single decade Vineyard went from a farm town of a few hundred to one of the fastest growing cities in the United States. Where the steel mill stood, a downtown is rising. The story is still being written.

2013 to 2020

The fastest growing city in America

Utah Valley University began buying land in Vineyard in 2011 and in 2014 bought 125 acres of the old Geneva site for a West Campus. New neighborhoods rose where farms had stood.

From 2014 to 2015 Vineyard grew 417 percent, faster than any city in America. On March 13, 2015, the Megaplex at Geneva opened on the old mill site with 13 screens and the first IMAX screen in Utah County. In 2016 Vineyard passed 1,000 residents and became a city.

Between the 2010 and 2020 censuses, 139 people became 12,543. No city in Utah grew faster.

417%growth, 2014 to 2015
12,543people in 2020
Center Street at Mill Road, Vineyard, June 2016
Center Street at Mill Road, Vineyard, June 2016An Errant Knight, CC BY-SA 4.0, via Wikimedia Commons
The Megaplex at Geneva, with Larry H. Miller's name on the sign
The Megaplex at Geneva, with Larry H. Miller's name on the signBuglord, CC BY-SA 4.0, via Wikimedia Commons
The UVU letters on campus, 2018
The UVU letters on campus, 2018Ben P L, CC BY-SA 2.0, via Flickr

August 12, 2022

A train stops in Vineyard

On August 12, 2022, the Vineyard FrontRunner station opened at 130 E. Market Street, the 15th station on the commuter line that runs from Provo to Salt Lake City and Ogden.

Vineyard station, August 2022
Vineyard station, August 2022An Errant Knight, CC BY-SA 4.0, via Wikimedia Commons
FrontRunner tracks under Geneva Road, 2016
FrontRunner tracks under Geneva Road, 2016An Errant Knight, CC BY-SA 4.0, via Wikimedia Commons

A downtown on the mill ground

Utah City

In August 2023 the developers of the old Geneva land announced a name for their 700 acre plan: Utah City, a walkable downtown built around the FrontRunner station. Its Greenline, a chain of parks and public spaces, connects the station to the Utah Lake shore.

Ground was broken for Bella's Market, a local grocery, on February 12, 2025, and it opened in November 2025. Year by year, the barren ground where the furnaces once stood is filling with homes, shops, parks and people.

Utah City, downtown Vineyard
Utah City, downtown VineyardJacob Wood
The Megaplex at Geneva from above
The Megaplex at Geneva from aboveJacob Wood
The old Geneva land where the new downtown now rises, 2015
The old Geneva land where the new downtown now rises, 2015An Errant Knight, CC BY-SA 4.0, via Wikimedia Commons

2020 to 2024

The lake comes back

The June sucker, the fish found only in Utah Lake, had fallen so low that in 2002 only 139 adults were observed spawning in the Provo River. A long recovery effort followed. On January 4, 2021, the fish was moved from endangered to threatened.

In March 2020 work began on the Provo River Delta, a 260 acre project that gave the Provo River a natural mouth again where it meets Utah Lake. The river was turned into its new channels in 2023, and the delta opened to the public in October 2024 with new trails. In 2024, 3,785 tagged June suckers were detected spawning there.

139June suckers spawning, 2002
5,000+tracked in the Provo River, 2022
Utah Lake off Vineyard Beach
Utah Lake off Vineyard BeachCity of Vineyard
The Vineyard lakeshore trail at sunset
The Vineyard lakeshore trail at sunsetJacob Wood

As of 2026

Vineyard today

About 20,000 people now call Vineyard home. Families walk and bike the lakeshore trail, trains stop downtown, and new neighborhoods look out over the same water the Timpanogos Utes fished, the friars described and the pioneers farmed beside.

From grapevines to steel to a city on the lake. The story is still being written.

Vineyard homes under Mount Timpanogos
Vineyard homes under Mount TimpanogosJacob Wood
The lakeshore at Sunset Beach Park
The lakeshore at Sunset Beach ParkCity of Vineyard
Gammon Park
Gammon ParkCity of Vineyard

Era VIII

Key moments.

Full timeline
2011
Utah Valley University begins buying land in Vineyard.
Read the story →
2014
UVU buys 125 acres of the Geneva site for a West Campus.
Read the story →
2015
Vineyard grows 417 percent from 2014 to 2015, faster than any city in America.
Read the story →
2015March 13
The Megaplex at Geneva opens on the old mill site with Utah County's first IMAX screen.
Read the story →
2016
Vineyard passes 1,000 residents and becomes a city.
2020
The census counts 12,543 people. No city in Utah grew faster that decade.
2020March
Work begins on the Provo River Delta, a 260 acre restoration for the June sucker.
Read the story →
2021January 4
The June sucker, found only in Utah Lake, is moved from endangered to threatened.
Read the story →
2022August 12
The Vineyard FrontRunner station opens at 130 E. Market Street.
Read the story →
2023August 29
The developers of the old Geneva land name their 700 acre downtown Utah City.
Read the story →
2024October 25
Leaders celebrate the opening of the restored Provo River Delta.
Read the story →
2025February 12
Ground is broken for Bella's Market in Utah City.
Read the story →
2025November
Bella's Market, a local grocery, opens in Utah City.
Read the story →
2026
About 20,000 people call Vineyard home. 250 years after the friars, the story is still being written.

On film

Watch.

Vineyard, Utah downtown area, mid-development

Downtown Vineyard taking shape on the Geneva site.

Front Runner Train Footage

Historical Geneva Steel Ruins Fly Over

A flight over the foundations of the old mill.

Team Louish

Geneva Steel Slag Heap Aerial Video

Aerial video of the Geneva slag heap.

James Dalrymple